Back to portfolio

    Bathroom Renovation

    Full Bathroom Remodel

    Frisco, TX • 10 days

    A dated bathroom taken down to the studs and rebuilt — large-format tile surround, a checkered tile floor, a double vanity with quartz countertops, and all new fixtures and lighting, completed in ten days.

    BeforeStep 1 of 9
    Full Bathroom Remodel — Before

    The original bathroom with dated mottled floor tile, a builder-grade vanity, and a cultured marble top.

    Before — Tub SurroundStep 2 of 9
    Full Bathroom Remodel — Before — Tub Surround

    The old subway tile surround with a glass mosaic accent stripe and chrome fixtures.

    DemolitionStep 3 of 9
    Full Bathroom Remodel — Demolition

    Walls opened up and the room stripped back, with electrical rerouted for the new layout.

    Demolition — Tub AlcoveStep 4 of 9
    Full Bathroom Remodel — Demolition — Tub Alcove

    The tub alcove taken back to the studs and insulation before rebuilding.

    Tile WorkStep 5 of 9
    Full Bathroom Remodel — Tile Work

    Large-format tile going up over a waterproofed surround, set level and spaced by hand.

    FlooringStep 6 of 9
    Full Bathroom Remodel — Flooring

    The checkered floor tile laid out and spaced, one tile at a time.

    FinishingStep 7 of 9
    Full Bathroom Remodel — Finishing

    Drywall floated and finished, with the new vanity and quartz countertop set in place.

    FinishedStep 8 of 9
    Full Bathroom Remodel — Finished

    The completed bathroom — checkered floor, tiled surround, matte black fixtures, and new lighting.

    Finished — VanityStep 9 of 9
    Full Bathroom Remodel — Finished — Vanity

    The double vanity with quartz countertop, brass-framed mirrors, and matte black faucets.

    Ready to start your own project?

    Tell us what you have in mind and we'll walk you through every step.

    Get a Free Estimate